Gallery
Catch a glimpse of our daily work
Linear infrastructure project | Archaeological services| Working hand in hand with construction
Development of a commercial estate| Pre-construction archaeological survey
Development of a housing estate | Segment of a neolithic ditch system in a longitudinal section
New housing estate = old housing estate | 2000-year-old traces of human habitation | Quarter section of a pit
New residential building in the old town | Archaeological documentation tells the site’s story
Restoration and redesign of a palace square | Archaeological investigation layer by layer during construction
Linear infrastructure trenches | Relocating excavation work away from the site | Block recovery of an extraordinary warrior’s grave
Redesign of the market square outside a church | A burial is discovered...
Roadworks | Archaeological investigation and salvage of an early modern urban cemetery to maximum depth of construction
Development of a residential estate | Recovery of a 1200-year-old sword for conservation by the state heritage department
Construction of a new university building | Archaeological investigation of an early modern cemetery
New construction in an old city quarter | Public interest in excavated features prior to removal
Redesign of a marketplace | Earthworks for a new fountain unexpectedly uncover archaeological features (Gutingi)
Restoration of a half-timbered building | Construction and archaeology in tight quarters
Construction of a new urban office block | Remains of a well and soil features from previous medieval/post-medieval construction
Development of a new hotel with underground parking | Historical cellar | Photogrammetric documentation instead of a hand sketch expedites construction work
Covid | Progress at a distance...
Site of a new day-care centre| Pre-construction archaeological survey | Block recovery of an urn
Rebuilding the canal wall | Archaeological investigation and removal of modern construction to reveal the oldest embankments
Touristic development of a castle site | Archaeological survey and documentation of an area| Unanswered questions about the layout
Construction of a memorial at the satellite concentration camp Ahlem | Archaeological documentation of the remains of barrack foundations and a post-war Nissen hut (crosswise)
Memorial at the site of the concentration camp Bergen-Belsen | Archaeological documentation of built heritage | Delousing station
New housing estate | This system of drainage ditches is a relic of a historical planting | Cross profile for verification
Housing development | Trial trenching | Archaeological potential was not confirmed despite optimal conditions for a settlement
Linear project | Archaeological supervision of earthworks | Articulated excavator with flat-edged shovel to verify site potential
Motorway expansion A1 | Public-private partnership project | Coordination of archaeological heritage conservation | Insight into known archaeological site at Groß Meckelsen
Sand mining | Drone imaging during backfill of test trenches | Building footprint in the expansion area
New housing development | Excavation of profiles and systematic recovery of artefacts
School construction | Archaeological monitoring of demolition works | A pottery had previously been identified here, and evidence remained despite later site development